Thanks, I'll take a look.
Best regards,
Kirsten Keith
On Sun, May 6, 2018 at 3:12 PM Stephan Van Pelt wrote:
> Dear Council and staff,Attached is an e-mail with the above title I sent to the Council back in 2015. I can no longer find it on
the Menlo Park site so its probably long been deleted. I suspect my copy re-appeared from cache on my machine that it was
originally sent from.I think this deserves serious consideration. Not needing to construct a Shoofly Track to build the Ravenswood
underpass is a big deal. In addition current discussions point to future needs for 3 or even 4 tracks through Menlo Park, so
realize the "bridges" described in the attachment will currently only hold 2 tracks in the same alignments as they now exist, but
the bridge structure could be constructed wide enough to hold 3 or 4 tracks in the future. Again needing NO Shoofly for the
follow-on construction over Ravenswood.
Sincerely, Steve Van Pelt, Menlo Park
--
Best regards,
Kirsten Keith,
Councilmember and former Mayor, City of Menlo Park